Solar Power Plant

Solar Power Plant

  • 615kW peak
  • 1370 panels
  • 7200 trees per year
  • 1.1 mil miles per year
  • 480klbs coal per year

Factory tour

Warehouse 2 Warehouse 1 Sorting rea a Receiving of defect units and material Export area Central warehouses for Europe (HUBs) Administration PCA repair Refurbishment Scanner and printer repairs Small units repair service ESD Workshop Scanner and printer repairs Smartphone service Introduction of units Digital camera and projector repair Small units export Server rack assembly Workshop

Server rack assembly

  • Completion and assembly according to configuration
  • Racks server integration L11
  • Final test and burn in test in testing room

Digital camera and projector repairs

  • Cleanliness and precision are essential in these repairs.
  • Many optics tests and calibration are used here.

PCA repair

  • Manual and semi-automatic replacement of components or BGAs on the printed circuit board (level 3).

Smartphone service

  • The quality and speed of service repair is for end customer important and this means:
    • Experienced and regularly trained technicians in the workshop.
    • Using the input quality control and special testing and repair tools
    • Data backup at customer’s request
    • Technical and organizational measures for the protection of personal data have been set.

Scanner and printer repairs

  • Input diagnostics using special software.
  • Replacement of defective components with new ones. Complete cleaning, assembly and testing (functional and hi-pot test).
  • Packaging and shipping the refurbished unit as good as new.

Introduction of units into the inf. database

  • Visual check of equipment and accessories.
  • Defect device record (SN, IMEI, CSO, warranty check,..) and customer contact details record – unit logging.

Small units export

  • ...
  • ...
  • ...

Small units repair service

  • ...
  • ...
  • ...

Refurbishment of small house appliance

  • Preparing of returned goods for re-sale. This B2B activity includes incoming inspection and sorting.
  • Module repair and testing of the appliance for its safety.
  • Then the products are packed and shipped back to the business partners.
  • Unrepairable products that are at the end of their life cycle are sent to electrical equipment recycling.

Central warehouses for Europe (HUBs)

  • Spare parts are picking according to customer orders.
  • Precise location of spare parts in the Kardex storage system speeds up picking.
  • Redistribution units with dangerous goods (as instance lithium batteries) in accordance with ADR or IATA.

Export area

  • Packing units according to the procedure.
  • We use a packer for optimal packaging of pallets.

Receiving of defect units and material

  • Unloading trucks using forklifts or handing over shipments from vans.
  • Registration of all shipments.
  • Unpacking, photo documentation and sorting by brands.

Sorting area

  • ...
  • ...
  • ...

Warehouse 1

  • Manipulation and low warehouse (3 776 m2)

Warehouse 2

  • A semi-automatic induction-guided forklift serves 4 612 pallets positions on an area of 2 122 m2.